Bondable. Pre-positioned.
USACE-aligned.
Parks, Recreation, Forestry departments. Parish drainage districts. Survey and engineering firms. Line-of-sight, transit lanes, passable interior roads, levee work, post-storm activation. We bid both.
What we do for
agencies and surveyors.
Bid-ready. Permit-literate. Hurricane-prepositioned.
Parks, Recreation, and Forestry departments at parish, state, and federal levels: vegetation management, trail and access maintenance, post-storm debris and ROW restoration, hazard-tree removal, controlled clearing for forest-health objectives. We bid through formal procurement, work under cooperative purchasing, and sub under prime contractors on FEMA-aligned debris contracts.
Parish drainage districts and USACE-aligned levee work: restoration after the high-water cycle, weak-section reinforcement, multi-mile rebuild runs. Compaction to district spec, lift-by-lift, with density testing as required. Engineer of record signs off before we demob.
Survey and engineering firms: clearing line-of-sight for surveys, creating passable roadways within overgrown properties for survey work, complete land clearing for design work. We coordinate directly with the survey crew or the EOR. No middleman, no marked-up sub.
Services most used
for agencies & surveyors.
Pick the one that fits, or call us with the property and we'll name it.
Land Clearing & Re-shaping
Take it down. Re-shape the ground.
Levee Repair
Reinforce. Restore. Rebuild.
Ponds & Pond Maintenance
Build, dredge, restore.
Right-of-Way Clearing & Maintenance
High-line, pipeline, utility corridors.
General Dirt Work
Drainage, grading, fill, demo.
Forestry Mulching
Single-pass clearing. No haul-off.
Credentials that
matter for this lane.
Verifiable. On request. Same day.
Performance and payment bonds available through established surety relationships.
Sub under CrowderGulf / DRC / Ceres / Phillips & Jordan. Or direct under parish / state contracts.
Federal levee protocols. Coordination with engineer of record. Compaction plus density testing to spec.
$1M general liability, with options to increase per job requirements. COI in your inbox within 24 hours.
Standby equipment and crews June through November. Vegetative debris plus ROW restoration on call.
Louisiana coastal CUP, parish drainage, wetland coordination. We handle the field side; your engineer handles the paper.
Questions answered.
Before the call.
The questions agencies & surveyors actually ask.
Are you bondable?
Are you FEMA-experienced for post-storm work?
Do you do federal levee work to USACE standards?
Can you clear a survey corridor or transit lane for an engineering firm?
Do you work cooperative purchasing or piggyback contracts?
What's your insurance situation for parish or state work?
Need a bid packet
or a COI on file?
Send the solicitation, the MSA, or the procurement contact. We'll respond on your forms and have the COI in your inbox within 24 hours.