Levee work is south Louisiana reality. After a high-water cycle, levees come back with sloughed faces, weak runs, and outright breaches, and the fix is not pushing the slough back up the slope. It's clay from approved borrow, placed in lifts, compacted with sheepsfoot rollers, tested where the spec calls for it. The honest part is the schedule: a levee job has water on both sides of the calendar, the flood that did the damage and the rain that's coming. We work the dry windows hard and we don't place clay that's too wet to compact, because a levee rebuilt wrong fails at the worst possible time. Parish drainage districts, USACE-aligned protocols where federal levees are involved, and private agricultural levees all in scope. Engineer of record signs off before we demob.
Highly variable. Bid on a linear-foot basis. A single 500-foot section can run a week; a multi-mile drainage-district restoration runs months.
Single weak-section repairs through multi-mile drainage-district rebuilds. Bondable for public work.
Coastal and inland Louisiana levees, ag levees, parish drainage canal banks, private flood-zone restoration.
Big iron.
Production-grade.
The right tool for the job. Always sized up.
Dozers (450 to 850 classes available)
Levee shaping, lift placement
Excavators
Toe-of-slope work, drainage cuts, geotextile installation
Compactors (sheepsfoot)
Lift-by-lift compaction to clay spec
Articulated dump trucks
Clay haul-in from approved borrow
Same every time.
Predictable on site.
Site walk. Mobilize. Execute. Walk off.
- 01
Site Walk
We walk the property with you, on the ground or by drone. Acreage, terrain, access, wet spots, utility crossings, trees you want kept, and the finish you actually want. The quote comes from the walk, not a satellite guess.
- 02
Mobilization
Equipment lowboys in. 811 locates called and cleared before any ground-engaging work: Louisiana 811, Texas 811, or Mississippi 811, depending on where the job sits. SWPPP and erosion control set on industrial sites. COI, named-additional-insured, and waiver-of-subrogation endorsements issued on request.
- 03
Execution
The iron does the work: our forestry mulcher, excavators, and dozers as the job calls for. Daily check-ins. Drone progress shots on jobs over 5 acres. Daily SWPPP inspection on industrial sites.
- 04
Walk-Off
Demobilize, restore the staging areas, final walk with you or your rep. Drone before/after package on jobs over 5 acres. Invoice when you sign off, not before.
The lanes that
run this work.
Click through for procurement, landowner, or agency-specific framing for levee repair.
Levee Repair.
Answered before the call.
Bidding questions, terrain questions, insurance questions: asked and answered.
Do you work with parish drainage districts?
How do you handle federal levees?
Can you haul in clay from approved borrow?
How does weather affect a levee job?
What states do you cover?
How fast can you mobilize?
Are you insured?
Do you publish pricing?
Often booked
alongside this work.
One crew. One mobilization. One invoice.
Ready to book levee repair?
Call us or send a property pin. We'll walk the site, scope the job, and quote it straight. No salesperson, you talk to the operator.